SIERRA CLUB
v.
UNITED STATES ARMY CORPS OF ENGINEERS
AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.
The Sierra Club challenged the Army Corps of Engineers' issuance of a permit for a road project (Ridge Road Extension) in Florida on grounds that the permit violated the Clean Water Act and National Environmental Policy Act by relying on outdated wildlife data, failing to adequately analyze cumulative environmental impacts, and selecting an inferior alternative. The district court upheld the permit, finding that the Corps took a hard look at environmental consequences, reasonably analyzed reasonably foreseeable development without speculating, and properly determined that the chosen route was the least environmentally damaging practicable alternative given the project's purpose.
The court adopted the Magistrate Judge's recommendation, finding the Army Corps' decision to issue a permit was not arbitrary or capricious, and thus complied with NEPA and the CWA.
[1] A district court reviews a magistrate judge's report and recommendation de novo when timely and specific objections are filed.
[2] When reviewing an agency decision under the Administrative Procedure Act, a district court acts as an appellate tribunal, determining whether the agency action is support…
Previewing 2 of 32 headnotes on this case. FLexlaw’s editorially structured points of law — every proposition, pinpointed — are reserved for members.
Join FLexlaw to unlock all legal intelligencePlaintiffs challenged the Army Corps' issuance of a permit for a roadway extension, alleging violations of the Clean Water Act and NEPA. The permit in…
The full statement of facts, procedural history, and disposition for this case are member content.
Join FLexlaw to unlock all legal intelligence© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.
Explore caselaw by topic → Browse Mitigation Measures cases and more on FLexlaw
This cause comes before the Court on the Report and Recommendation (“R&R”) of Magistrate Judge Julie S. Sneed (Doc. 100). In the R&R, Magistrate Judge Sneed recommends that the Court deny the Motion for Summary Judgment of Plaintiffs Sierra Club and Daniel Rametta (Doc. 68), and grant the Cross-Motions for Summary Judgment of Federal Defendants United States Army Corps of Engineers and Scott A. Spellmon, in his official capacity as Chief Engineer and Commanding General of the Corps, and Colonel Andrew Kelly, in his official capacity as Commander and District Engineer of the Corps, (collectively, “the Corps”) (Doc. 82), and Defendant-Intervenor Pasco County Board of County Commissioners (“Pasco”) (Doc. 83). Plaintiffs filed Objections to the R&R (Doc. 101), to which Defendants filed responses in opposition (Docs. 102, 103). Upon review and consideration of the R&R, the Objections, Defendants’ responses, the underlying motions, and the administrative record, the Court concludes the Objections are due to be overruled and the R&R adopted.
I. BACKGROUND
A. The Administration Decision and Lawsuit
On December 20, 2019, the Army Corps of Engineers issued a permit to Pasco County and the Florida Department of Transportation pursuant to section 404 of the
Clean Water Act (“CWA”), 33 U.S.C. § 1344(a). Doc. 1-1 at 1. The permit was issued in connection with Pasco’s longstanding efforts to construct a roadway referred to as the Ridge Road Extension (“RRE”) in order to improve mobility and evacuation routes in the county. Doc. 1-13 at 2. The RRE will span 8.65 miles, including 2.6 miles in the Serenova Tract of the Starkey Wilderness Preserve—an area designated as mitigation for the impacts of the Suncoast Parkway. Doc. 1-20 at 4, 12; Doc. 1 ¶ 12. The project requires fill material to be deposited over 42.40 acres of high-quality preserved wetlands, which will permanently impact a significant portion. Doc. 1 ¶ 1. Plaintiffs filed this action in February 2020, asserting that the Corps’ decision to issue the permit was unreasonable, arbitrary and capricious, not in the public interest, and otherwise not in accordance with federal law. Id. ¶ 6. Plaintiffs allege that the issuance of the permit violated the CWA and the National Environmental Policy Act (“NEPA”). With respect to NEPA, Plaintiffs argue that the Corps relied on stale data when concluding the RRE would not significantly impact the environment, failed to take a hard look at the cumulative impact of reasonably foreseeable development on adjacent properties, and based its mitigation on inadequate analysis. See Doc. 100 at 8, citing Doc. 68. They further contend that the Corps violated section 404(b) of the CWA with respect to its analysis of the least environmentally damaging practicable alternative (LEDPA), because it failed to rebut the presumption that there were practicable alternatives that did not involve special aquatic sites, and because the selection of the RRE as the LEDPA was contrary to the evidence. Id. at 19. Finally, Plaintiffs also allege that the Corps violated both statutes by failing to hold a public hearing. Id. at 8, 19.
B. The Report and Recommendation
The parties filed cross-motions for summary judgment. Docs. 68, 82, 83. On September1, 2022, the magistrate court issued an R&R in which it recommended denying Plaintiffs’ motion for summary judgment and granting summary judgment in favor of Defendants. Doc. 100. The magistrate court first concluded that Plaintiffs had not met their burden of proof to establish that the Corps violated NEPA. In so finding, the court emphasized that the Corps’ decisions and analyses are entitled to substantial deference, and that NEPA mandates consideration of environmental factors but not a particular result. Id.
at 11, 15-16, 17. In light of those principles, the record demonstrated that the Corps took the requisite hard look at the RRE’s impacts on wildlife and the proposed mitigation, considered the cumulative effects of the permit, including indirect impacts, and went through the necessary process of reviewing mitigation measures. Id. at 12-
18.
Next, the magistrate court found that Plaintiffs failed to establish that the Corps acted arbitrarily and capriciously in analyzing practicable alternatives to the proposed RRE site under the CWA. Id. at 20-25. Out of the 19 sites the Corps reviewed, the court determined there was no option that could satisfy the project’s purpose and that would have been entitled to a presumption that it was a practical alternative. Id. at 22- 23. The Corps had rejected Plaintiffs’ preferred alternative, Tower Road, as the LEDPA because it was significantly more costly and would provide much less improvement to evacuation times than the RRE. Id. at 23-25.
Lastly, the magistrate court concluded the Corps was not required to hold a public hearing under NEPA or the CWA. The Corps satisfied NEPA’s requirement for public participation when it issued notices and received over1,800 public comments. Id. at 18. Moreover, while the CWA mandates an “opportunity for public hearings,” it does not require the Corps itself to hold the hearings. Id. at 25. The Corps did not act arbitrarily or capriciously in relying on the public comments. Id. at 25-26.
C. Objections and Responses in Opposition
Plaintiffs filed timely Objections to three aspects of the R&R. Doc. 101. First, Plaintiffs contend that the magistrate court erred in giving “extreme deference” to the
Corps’ decision to accept the Biological Opinion of the United States Fish and Wildlife Service (“FWS”), which relied on stale data. Id. at 1, 11-14. 1 This reliance contradicted the FWS’ previous guidance, which required current, updated wildlife
15.
Pasco similarly argues that substantial deference is required by the Administrative Procedure Act, contending that Plaintiffs have provided no applicable authority for its novel view that it is not. Doc. 103 at 7-10. Indeed, review of a decision to rely on a Biological Opinion is confined to whether a party can identify information that was not taken into account and that challenges the opinion’s conclusions, which Plaintiffs have not done. Id. at 12. Pasco argues that the Corps’ decision to rely on the Biological Opinion was not arbitrary and capricious, and further points out that any alleged inconsistency with FWS’ policy would be irrelevant to review of the Corps’ decision. Id. at 13. Pasco also urges the Court to reject Plaintiffs’ argument about mitigation because they fail to adequately explain and identify the portions of the R&R they are purportedly challenging. Id. at 14. Plaintiffs’ second objection relates to the magistrate court’s finding that the
Corps adequately considered the cumulative impacts of the project. Doc. 101 at 17-20. Plaintiffs contend that the administrative record demonstrates the Corps did not evaluate the impact of reasonably foreseeable developments, given that the RRE was always intended to act as an arterial roadway to support development in the area. Id. at 17-18. The Corps’ refusal to engage in the forecasting of cumulative impacts on reasonably foreseeable development constitutes a failure to uphold its duty under NEPA. Id. at 20. In response, the Corps argues that it took a hard look at the cumulative impacts of reasonably foreseeable development, just as the R&R correctly concluded. Doc. 102 at 16-18. Plaintiffs’ claim that the Corps ignored the impacts is based on a single statement in FWS’ Biological Opinion, but other evidence in the record demonstrates that the Corps thoroughly examined them. Id. at 16-17. The Corps also challenges Plaintiffs’ assertion that the RRE was intended to and would lead to further development, pointing to contrary evidence in the record. Id. at 17-18. It contends that
Plaintiffs’ objection amounts to disagreement with the Corps’ decision rather than a showing of error. Id. Pasco, too, identifies evidence in the record that it asserts demonstrates that the Corps “extensively analyzed” the RRE’s cumulative effects. Doc. 103 at 15-17. Third, Plaintiffs contend that the magistrate court erred in its conclusion that the Corps’ choice of the RRE as the LEDPA was not arbitrary and capricious, because it was contrary to the evidence in the administrative record demonstrating that Tower
Road was the LEDPA. Id. at 20-23. The magistrate court relied on a miscalculation of wetland impact acreage in the record that was contradicted by more reliable evidence. Doc. 101 at 20-21. Moreover, the record contained evidence that Tower Road would be far less costly than initially estimated and far less damaging to the environment than the RRE. Id. at 21-23.
Responding to Plaintiffs’ third objection, the Corps argues that Tower Road could not have been chosen as a LEDPA because it was not practicable, a fact Plaintiffs ignore. Doc. 102 at 18-19. The primary purpose of the project was to improve mobility and evacuation times; the Corps concluded that Tower Road would barely do so, while the RRE would lead to significant reductions. Id. at 19. Tower Road would also require the acquisition of 14 homes. Id. The Corps disagreed with Plaintiffs that the wetland impact estimate the magistrate court and the Corps relied on was a “miscalculation,” instead arguing that it would have been unreasonable for the Corps to use Plaintiffs’ preferred figure. Id. at 21-22. Moreover, the data regarding
Tower Road’s impact and cost that Plaintiffs cite is largely outdated or irrelevant, but only serves to highlight the diligence of the Corps’ analysis. Id. at 23-24. Pasco echoes the Corps’ response to Plaintiffs’ third objection. Doc. 103 at 18- 21. It emphasizes that Tower Road was not a practicable alternative because of the project’s purpose, and thus would not have been built “at any price.” Id. at 18-19. Pasco also challenges Plaintiffs’ claim regarding the alleged miscalculation, explaining that the figure cited in the R&R was the correct one. Id. at 20-21.
II. LEGAL STANDARD
When a party makes a timely and specific objection to a magistrate judge’s report and recommendation, the district judge “shall make a de novo determination of those portions of the report or specified proposed findings or recommendations to which objection is made.” 28 U.S.C. § 636(b)(1)(C); see Fed. R. Civ. P. 72(b)(3). The district judge may accept, reject, or modify, in whole or in part, the findings and recommendations. 28 U.S.C. § 636(b)(1)(C). The district judge reviews legal conclusions de novo, even in the absence of an objection. See Cooper-Houston v. S. Ry. Co., 37 F. 3d 603, 604 (11th Cir. 1994); Ashworth v. Glades Cnty. Sch. Bd. of Cnty. Comm’rs, 379 F. Supp. 3d 1244, 1246 (M.D. Fla. 2019).
When a party seeks review of an agency decision under the Administrative Procedure Act (“APA”), the district court sits as an appellate tribunal. See Brinklys v. Johnson, 175 F. Supp. 3d 1338, 1349 (M.D. Fla. 2016). Summary judgment is the mechanism for deciding whether, as a matter of law, the agency action is supported by the administrative record and is otherwise consistent with the APA standard of review.
Id. Under this standard, the reviewing court must “hold unlawful and set aside agency action, findings, and conclusions found to be…arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.”5 U.S.C. § 706(2)(A). “‘This standard is exceedingly deferential,’ and limits our role to ‘ensuring that the agency came to a rational conclusion.’” VHV Jewelers, LLC v. Wolf, 17 F. 4th 109 (11th Cir. 2021), quoting Sierra Club v. Van Antwerp (“Antwerp I”), 526 F. 3d 1353, 1360 (11th Cir. 2008) (alterations omitted). The court cannot conduct its own investigation or substitute its own judgment for the administrative agency’s decision. Antwerp I, 526 F. 3d at 1360.
III. DISCUSSION
A. Reliance on Biological Opinion Without Updated Surveys
In Plaintiffs’ first objection, they challenge the magistrate court’s conclusion that the Corps took a hard look at the RRE’s impacts on wildlife despite the Corps’ reliance on older data. Doc. 101 at 11-16. Specifically, Plaintiffs object to the Corps’ acceptance of the FWS decision not to require updated wildlife surveys for its Biological Opinion, contrary to the Corps’ earlier position and FWS’ own guidelines.
Id. at 13-16. Plaintiffs contend that this reversal is entitled to less deference than a normal agency decision and is arbitrary and capricious. Id. at 12, 16. In response, both Defendants argue that substantial deference remains the appropriate standard of review. Doc. 102 at 14; Doc. 103 at 7-10. NEPA requires federal agencies to take a “hard look” at the environmental consequences of a proposed project. See Kleppe v. Sierra Club, 427 U.S. 390, 410 n.21 (1976). NEPA does not mandate particular results; provided an agency adequately identifies and evaluates a proposed action’s adverse environmental consequences, the agency is permitted to decide that other values outweigh the environmental costs. Robertson v. Methow Valley Citizens Council. 490 U.S. 332, 350 (1989). The agency has met its “hard look” requirement if it “has examined the relevant data and articulated a satisfactory explanation for its action including a rational connection between the facts found and the choice made.” Sierra Club v. U.S. Army Corps of Engineers, 295 F. 3d 1209, 1216 (11th Cir. 2002) (quotation omitted). On the other hand, it has not undertaken the requisite hard look if: (1) the decision does not rely on the factors that Congress intended the agency to consider; (2) the agency failed entirely to consider an important aspect of the problem; (3) the agency offers an explanation which runs counter to the evidence; or (4) the decision is so implausible that it cannot be the result of differing viewpoints or the result of agency expertise.
Id. at 1216. As with all administrative decisions, “a court can only find a federal agency’s attempted NEPA compliance inadequate where it is arbitrary, capricious, or an abuse of discretion[.]” Antwerp (I), 526 F. 3d at 1361. “This standard requires substantial deference to the agency, not only when reviewing decisions like what evidence to find credible…but also when reviewing drafting decisions like how much discussion to include on each topic, and how much data is necessary to fully address each issue.” Id. When a court is reviewing an agency’s decision to rely on a Biological Opinion (“BiOp”) by the FWS, “the critical question is whether the…agency’s reliance was arbitrary and capricious, not whether the BiOp itself is somehow flawed.” City of Tacoma, Wa. v. F.E.R.C., 460 F. 3d 53, 75 (D.C. Cir. 2006) (emphasis in original). In the parallel context of the Endangered Species Act, the Ninth and D.C. Circuits have held that even when the underlying opinion is based on “admittedly weak” information, an agency’s reliance on it will satisfy its obligations “if a challenging party can point to no ‘new’ information—i.e., information the [Fish and Wildlife] Service did not take into account—which challenges the opinion’s conclusions.” Pyramid Lake Paiute Tribe v. U.S. Dep’t of Navy, 898 F. 2d 1410, 1415 (9th Cir. 1999) (citation omitted); City of Tacoma, 460 F. 3d at 75 (citing Pyramid Lake). On the other hand, “reliance on a facially flawed BiOp would likely be arbitrary and capricious.” Id.; see Shafer & Freeman Lakes Environmental Conservation Corp. v. Federal Energy Regulatory Commission, 992 F. 3d 1071, 1096 (D.C. Cir. 2021) (“complete failure to address an important issue” rendered opinion facially flawed); Ergon-West Virginia, Inc. v. U.S. Environmental Protection Agency, 896 F. 3d 600, 612 (4th Cir. 2018) (agency cannot “turn a blind eye to errors and omissions apparent on the face of the report” on which it is relying). Plaintiffs contend that the Corps acted arbitrarily and capriciously by relying on a BiOp that did not require updated wildlife habitat surveys and instead applied the results from surveys completed in 2013. Plaintiffs do not identify any new information that challenges the Biological Opinion. See Pyramid Lake, 898 F. 2d at 1415. Instead,
they argue that it was flawed because the 2013 surveys were no longer valid by the time it was written, and that the FWS’ change in position regarding the validity of the surveys demonstrates the unreliability of its opinion. Plaintiffs primarily rely on a 2007 FWS statement that “[i]n general, wildlife surveys for the entire proposed corridor should reflect current conditions with surveys no older than three years.” AR 153, see also AR 36392, 43454, 43726 (quoting same source). FWS’ eastern indigo snake survey protocol also states that the Service “will consider the results of the survey [] to be valid for two…years from the date of completion, unless the habitat has been significantly modified.” AR 9402. However, the FWS has also stated that it “routinely extends the validity of survey results for eastern indigos and other species if conditions within an action area have not significantly changed (i.e. major wildfire which significantly altered the landscape).” AR 33368. Plaintiffs do not identify any significant changes to the action area’s conditions or landscape. The Court therefore disagrees that FWS’ decision that updated surveys were not necessary in this case was a “change in position.” Cf. Doc. 101 at 12;2 see AR 39700 (Corps requesting that FWS notify it if additional information is needed to complete BiOp); AR 47869 (FWS indicated the data was sufficient for its review). The BiOp was not flawed on its face,
and it was not a clear error of judgment for the Corps to follow it. See City of Tacoma, 460 F. 3d at 75. Moreover, the Corps’ wildlife habitat conclusions, relying on the BiOp, were not arbitrary or capricious. Plaintiffs’ quotations from the Corps’ Environmental
Ecology Center v. Castaneda, 574 F. 3d 652, 665 (9th Cir. 2009) (characterizing the data in Land Council as “fifteen years old, inaccurate, and insufficient on many variables.”). Plaintiffs have not identified any deficiencies in the wildlife habitat surveys in this case aside from their age, and the administrative record demonstrates that Pasco followed FWS’ recommended protocol in conducting the surveys. See, e.g., AR 39868.3 In all,
as in SOSS2, Inc. v. U.S. Army Corps of Engineers, 491 F. Supp. 3d 1231, (M.D. Fla. 2020), Plaintiffs have not provided sufficient reason to doubt the accuracy of the data the Corps relied on such that its reliance signifies a failure to take a hard look.
1304, 1314 (11th Cir. 2020) (the APA standard of review is “exceedingly deferential”) (quotation omitted). Plaintiffs contend that a lesser standard of review is warranted when an agency acts inconsistently with an internal guideline, Doc. 101 at 12, but it is not clear which agency or guideline they are referring to. As discussed, the Court finds that the Corps—the agency whose decision is being reviewed—did not contradict its own guidelines. See supra n.2. Plaintiffs’ assertion that the standard of Chevron deference has been lessened in recent Supreme Court jurisprudence, id. at 5, 8, also has ambiguous applicability to the instant appeal, which is reviewing an agency decision rather than an agency’s interpretation of a statute. See Doc. 103 at 8-9.
Plaintiffs have not established that the standard of review has changed in the context of this action. See Black Water Riverkeeper, Inc. v. U.S. Army Corps of Engineers, 833 F. 3d 1274, 1285 (11th Cir. 2016) (“The arbitrary and capricious standard is a highly deferential one, and we cannot substitute our judgment for that of the agency as long as the agency’s conclusions are rational and reasonably explained…Our inquiry is limited by law to whether the agency’s decision was based on a consideration of the relevant factors and, ultimately, whether it made a clear error of judgment.”) (quoting Antwerp (I), 526 F. 3d at 1360). The Court does not find that the Corps made a clear error of judgment or that it failed to take a hard look when it relied on the Biological Opinion. Plaintiffs’ first objection is therefore due to be overruled.4
B. Cumulative Impacts Analysis
In Plaintiffs’ second objection, they argue that the Corps did not adequately consider the RRE’s cumulative impacts because it failed to evaluate the effects of reasonably foreseeable development. Doc. 101 at 17-24. Plaintiffs contend that the project was always intended to support the region’s development, which, because it was already occurring, was not unduly speculative. Id. at 17-18. Both Defendants respond that the record demonstrates the Corps did consider reasonably foreseeable development. Doc. 102 at 16-18; Doc. 103 at 15-17. The Corps further asserts that it reasonably concluded development of adjacent lands did not depend on the RRE. Doc. 102 at 17-18.
NEPA requires a federal agency to examine the cumulative impacts of a proposed project in connection with any other action. City of Oxford, Ga. v. F.A.A., 428 F. 3d 1346, 1353 (11th Cir. 2005). A cumulative impact is “the impact on the
1508.7. Cumulative effects can be both direct and indirect. Id. at § 1508.8. Indirect effects may include “growth inducing effects and other effects related to induced changes in the pattern of land use, population density, or growth rate[.]” Id. “By ‘reasonably foreseeable,’ the regulations mean effects that are sufficiently likely to occur that a person of ordinary prudence would take them into account in reaching a decision.” Ctr. for Biological Diversity v. U.S. Army Corps of Engineers, 941 F. 3d 1288, 1293 (11th Cir. 2019), quoting EarthReports, Inc. v. FERC, 828 F. 3d 949, 955 (D.C. Cir. 2016) (modifications accepted). The Eleventh Circuit observed that restricting the analysis to foreseeable actions “ensures that the details of these actions are sufficiently concrete for the agency to gather information useful to itself and the public.” City of Oxford, 428 F. 3d at 1353-54. Otherwise, “investigators and researchers would be forced to analyze the environmental impact of a project, the parameters and specifics of which would be a mere guess.” Id. at 1356; see also Kleppe v. Sierra Club, 427 U.S. 390, 402 (1976) (“Where no…plan exists, any attempt to produce an impact statement would be little more than …[an] estimate[] of potential development and attendant environmental consequences.”). The Counsel on Environmental Quality (CEQ) described an agency’s obligation as follows: The EIS must identify all the indirect effects that are known, and make a good faith effort to explain the effects that are not known but are “reasonably foreseeable.” … It will often be possible to consider the likely purchasers and the development trends in that area or similar areas in recent years; or the likelihood that the land will be used for an energy project, shopping center, subdivision, farm or factory. The agency has the responsibility to make an informed judgment, and to estimate future impacts on that basis, especially if trends are ascertainable or potential purchasers have made themselves known. The agency cannot ignore these uncertain, but probable, effects of its decisions.
Forty Most Asked Questions Concerning CEQ's National Environmental Policy Act Regulations, 46 FR 18026-01 (1981). The Fifth Circuit has interpreted the reasonable foreseeability standard as requiring “a substantial degree of certainty.” See Medina Cnty. Environmental Action Ass’n v. Surface Transp. Bd., 602 F. 3d 687 (5th Cir. 2010).5 Applying the above principles, the Eleventh Circuit concluded in City of Oxford that the Federal Aviation Administration was not required to consider the impact of a future road relocation or construction of a new airport terminal in its cumulative impacts analysis, because neither action was reasonably foreseeable. 428 F. 3d at 1356. There was “simply not enough evidence” that either event would ever occur to
With what confidence can one say that the impacts are likely to occur? Can one describe them ‘now’ with sufficient specificity to make their consideration useful? If the decisionmaker does not take them into account ‘now,’ will the decisionmaker be able to take account of them before the agency is so firmly committed to the project that further environmental knowledge, as a practical matter, will prove irrelevant to the government's decision?
Sierra Club v. Marsh, 769 F. 2d 868, 878 (1st Cir. 1985) (citation omitted). necessitate the assessment of their environmental impacts, given that there was “no concrete plan to consider and little indication” that the construction would occur. Id. at 1354, 1356. The court noted that if a construction project were proposed in the future, the agency “may then be required to analyze the cumulative impacts of that project in conjunction with the project currently at issue.” Id. at 1356 n.23. Similarly, the court in Georgia River Network v. U.S. Army Corps of Engineers (I) concluded any additional impacts analysis was too speculative where “[n]othing on the record reveal[ed] any plans or proposals to develop,” and further development would require a Section 404 permit. 334 F. Supp. 2d 1329, 1345 (N.D. Ga. 2003); see also Headwaters, Inc. v. Bureau of Land Mgmt., Medford Dist., 914 F. 2d 1174, 1181-82 (9th Cir. 1990) (further development caused by access road construction was too speculative, where there were no plans in place and future uses were only conceivable rather than likely);
Georgia River Network v. U.S. Army Corps of Engineers (II), No. 4:10-cv-267, 2012 WL 930325, *40 (S.D. Ga. March 19, 2012), aff’d, 517 F. App’x 699 (11th Cir. 2013) (alleged impacts were speculative where “no concrete development plans or proposals were before the Corps to review or consider”); City of Shoreacres v. Waterworth, 332 F. Supp. 2d 992, 1008 (S.D. Tex. 2004), aff’d, 420 F. 3d 440 (5th Cir. 2005) (rejecting argument that future construction was reasonably foreseeable just because it was technically possible, where there was no plan or proposal in place and it would require congressional authorization). In contrast, in Florida Wildlife Federation v. U.S. Army Corps of Engineers, the court concluded additional development was a reasonably foreseeable effect of a project that included a road extension, where “one need only review the map of the proposed site in context to see that” the proposed road would “ultimately require a connection through an area on what the parties agree includes high value wetlands.” 401
F. Supp. 2d 1298, 1315 (S.D. Fla. 2005). Emphasizing that the road was originally planned to extend through the wetlands, the court observed it was “clear that the full benefit of this road is realized only when it is extended.” Id. at 1316. The Corps was therefore required to consider the impact of a future extension in determining whether to issue the current permit. Id.
Likewise, in Friends of the Earth, Inc. v. U.S. Army Corps of Eng'rs, the court held that the Corps was required to consider secondary development that would occur from casino construction project, because “increased growth in the area is the only reasonable prediction of what will occur if the casinos are built.” 109 F. Supp. 2d 30,
41 (D.D.C. 2000). Given that economic development was “an announced goal and anticipated consequence” of the project, it could not be considered “highly speculative” as the Corps claimed. Id.; see also Sierra Club v. Marsh, 769 F. 2d 868, 878- 79 (1st Cir. 1985) (agency was required to consider impacts of further development of an island caused by a project to build a causeway from the mainland, where it was
“nearly impossible to doubt” that such development would occur as a result of the causeway and the record contained detailed descriptions of the likely development). Causation is another question an agency or court must resolve when identifying cumulative impacts. NEPA requires a “reasonably close causal relationship” between the environmental effect and the alleged cause; only indirect effects that would be proximately caused by the permitted action require consideration. Dep’t of Transp. v. Public Citizen, 541 U.S. 752, 767 (2004); see also Center for Biological Diversity v. U.S. Army Corps of Engineers, 941 F. 3d 1288, 1295 (11th Cir. 2019) (rejecting but-for causal relationship as too attenuated to constitute an indirect effect). In C.A.R.E. Now, Inc. v. F.A.A., 844 F. 2d 1569, 1575 (11th Cir. 1988), for example, the Eleventh Circuit found that any increased growth at an Atlanta airport would not be attributable to the proposed runway extension project, but rather was “inevitable…given the projected growth of Atlanta and the strain on” its primary airport. As such, the agency’s limited analysis of the project’s cumulative effects was warranted. Id.; see also City of Shoreacres, 332 F. Supp. 2d at 1007 (agency was not required to consider hypothetical deepening of a ship channel among the proposed project’s cumulative impacts, because the project was not predicted to cause enough of the channel’s forecasted growth to create the necessity for deepening it); cf. Marsh, 769 F. 2d at 878 (building a causeway to island would be the clear cause of the island’s commercial growth); Florida Wildlife Federation, 401 F. Supp. 2d at 1326 (the record could only support the conclusion that the project would be “growth inducing” were there was no evidence any development of the area had been contemplated irrespective of the project).
Finally, the agency’s consideration of the cumulative impacts of reasonably foreseeable effects must be fulsome to satisfy NEPA. In Conservancy of Sw. Florida, Inc. v. Williams, 13-14477-CIV, 2018 WL 11422990, *9 (S.D. Fla. Dec. 21, 2018), the court found the Corps satisfied its obligations when it “devoted 12 pages of its environmental assessment to discussion of the cumulative and secondary impacts of the Project,” recognizing and discussing in detail various environmental issues in the context of other projects in the area. The court further concluded that it was not arbitrary and capricious for the Corps to discuss only projects that had received permits at the time of its decision, but not those that had been proposed but not permitted. Id.; see also D’Olive Bay Restoration & Pres. Comm., Inc. v. U.S. Army Corps of Engineers, 513 F. Supp. 2d 1261, 1294 (S.D. Ala. 2007) (Corps “extensively discussed impacts from past, present and future projects,” expressly took into account that it expected the public would continue to apply for section 404 permits, and concluded the project would not add to any preexisting water quality impairments); cf. Sierra Club v. U.S. Army Corps of Engineers, No. CV H-11-3063, 2012 WL 13040281, *15 (S.D. Tex. Aug. 22, 2012) (it was arbitrary and capricious for Corps “to recognize future development in one section of [its] report, but, in another, not acknowledge that analysis and assert that future development is too speculative”); Florida Wildlife Federation, 401 F. Supp. 2d at 1326 (Corps’ bare statements that it was “aware” that future development may occur and that the project “may entice” further development constituted “grossly inadequate consideration of the reasonably foreseeable indirect effects” of issuing a permit); Western North Carolina Alliance v. N.C. Dep’t of Transp., 312 F. Supp. 2d 765, 773 (E.D.
N.C. July1, 2003) (inadequate consideration of cumulative impacts where report merely described other projects but did not analyze their impacts). Here, the Court agrees with the magistrate court that the Corps fulfilled its cumulative impacts obligations under NEPA, and rejects Plaintiffs’ characterization that it refused to consider the effects of reasonably foreseeable projects and development. Doc. 101 at 18, 20. The Corps’ cumulative impacts analysis spanned 16 pages of its Environmental Assessment, thoroughly discussing the environmental impact of development on two watersheds between 1980 and 2030. AR 47999-48015.
The Corps expressly considered “the potential development effects associated with the roadway,” acknowledging that the RRE “is likely to increase accessibility to the area.” AR 48001. It emphasized, however, that, irrespective of the RRE, “the general area is trending toward development of the remaining available lands,” as Pasco County has increasingly become home to bedroom communities for Tampa workers. AR
48006, 48009-10. Based on its review of Pasco’s 2025 Plans and Long-Range Transportation Plans as well as permits for existing projects, the Corps found “it can be easily assumed that the land area” surrounding the RRE “will be developed” whether the RRE is constructed or not. AR 48000, 48009; see AR 47852 (explaining why future development of adjacent lands is not dependent on the RRE); cf. Florida
Wildlife Federation, 401 F. Supp. 2d at 1326 (no evidence growth would occur without project). It therefore concluded that construction would not induce development or notably alter the nature of the developments that have already been proposed. AR 48001.
Plaintiffs highlight the fact that the RRE permit application was amended to allow for up to seven signalized interchanges with a designation as an arterial roadway,6 arguing that the RRE was always intended to support the area’s
Plaintiffs’ contention that the Corps declined to consider the cumulative impacts of reasonably foreseeable development. Doc. 101 at 18-19. The Corps’ cumulative impacts analysis discussed the specifications of all projects that had already been granted a permit. AR 48001, 48009-10; see Florida, Inc., 2018 WL 11422990 at *9 (agency reasonably limited its discussion to permitted projects). Its statement that it “cannot approximate future wetland impacts from the conceptual permits or County comprehensive plans,” and its refusal to guess the specific impacts of signalized interchanges whose locations had not even been proposed, are fully in line with its statutory responsibilities. AR 48009-10; cf. Doc. 101 at 19; see City of Oxford, 428 F. 3d businesses at reduced speeds. See “Road Function Classifications,” Federal Highway Administration, Nov. 2000, available at https://safety.fhwa.dot.gov/speedmgt/data_facts/do cs/rd_func_class_1_42.pdf. Thus, the RRE’s designation as an arterial roadway does not itself indicate an intent to support the local traffic that would result from further development. 7 Pasco explained that the amendment to allow for signalized interchanges was made “to make the permit application and review consistent with the most likely development scenario,” as it was “reasonably foreseeable” the new owner [of an adjacent parcel] would request access to [the] RRE” AR 35607, 35610. at 1356 (agency is not required to evaluate the impacts of a project whose parameters or specifications could only be guessed). But Plaintiffs ignore a broader point: the Corps’ cumulative impacts conclusions were based on its assumption that the area would become fully developed. AR 48009-10, 48011 (acknowledging that development would reduce the availability of wildlife habitat, pushing species to preservation and conservation areas); see D’Olive Bay, 513 F. Supp. 2d at 1294 (Corps’ conclusion expressly accounted for expectation that public would continue to fill waterways). There is simply no evidence that the Corps rejected the existence of future development as an “unforeseeable crystal ball inquiry,” as Plaintiffs claim. Doc. 101 at 19. The Corps’ overall conclusion that the RRE’s incremental contribution to the environmental effects of development would not be significant was not arbitrary or capricious. Despite the significant development of the area’s watersheds that has already taken place since 1980, the Corps explained that “the loss of wetlands has been fairly minimal” and “the area has seen an increase in the acreage of surface waters” as the result of laws requiring mitigation of impacted wetlands. AR 48006-07. Its emphasis on the necessity of permits and mitigation in discussing the predicted impacts of future projects was therefore reasonable, and did not reflect any shirking of obligations. Cf. Doc. 101 at 15-16; see City of Oxford, 428 F. 3d at 1356 n.23 (noting that agency would be required to analyze the cumulative impacts of future projects that were proposed in conjunction with the current one as permit applications were filed). With respect to wildlife habitats, the Corps concluded the cumulative impacts of the RRE and other local developments would be minimal because of the avoidance and minimization of habitat loss that has been successfully employed in other projects and that is planned for the current ones, including the RRE. AR 48011; C.A.R.E. Now, Inc. v. F.A.A., 844 F. 2d 1569, 1575 (11th Cir.1988) (“When mitigation measures compensate for otherwise adverse environmental impacts, the threshold level of ‘significant impacts' is not reached[.]”). It is simply inaccurate to say that the Corps refused to analyze the cumulative impacts on wildlife. Cf. Doc. 101 at 19.8 Plaintiffs’ second objection is due to be overruled.
Future development around the Starkey Wilderness Area will result in limiting the amount of habitat that is available for indigo snakes and their movement or dispersal…to other suitable areas. Within the Action Area will be an increase in buildings, roads, and associated infrastructure, all of which have the potential to have indirect adverse effects on indigo snakes. …However, these cumulative effects are difficult to quantify because we cannot predict where or when they might occur and we cannot specifically attribute adverse impacts to any one particular project… In the future, these factors will probably work synergistically against indigo snakes and we expect that these negative impacts will significantly reduce the number of indigo snakes in the area.
AR 45945. The FWS concluded in its final opinion that the RRE itself was not likely to jeopardize the indigo snake’s continued existence because of the mitigation measures that
C. The Selection of the RRE as the LEDPA
In Plaintiffs’ last objection, they argue that the Corps’ selection of the RRE as the LEDPA instead of Tower Road was arbitrary and capricious because the record demonstrates that Tower Road was less costly and far less damaging to the environment than the RRE. Doc. 101 at 21-23. Plaintiffs contend that the magistrate court erred in concluding otherwise based on a miscalculation in the record. Id. at 20- 21. Both the Corps and Pasco dispute Plaintiffs’ claim of a miscalculation, but argue that, in any event, Tower Road was not a practicable alternative. Doc. 102 at 18-24; Doc. 103 at 18-21. Under the CWA, the Corps is not permitted to grant a Section 404 permit “if there is a practicable alternative to the proposed discharge which would have less adverse impact on the aquatic ecosystem, so long as the alternative does not have other significant adverse environmental consequences.” 40 C.F.R. § 230.10(a). If the “project’s basic purpose” is not “water dependent,” then the Corps must presume that a practicable alternative that has a less environmental impact on the wetland is available. Id. § 230.10(a)(3). The applicant must then provide “detailed, clear, and convincing information proving that an alternative with less adverse impact is impracticable.” Sierra Club v. Van Antwerp (“Antwerp II”), 362 F. App’x 100, 106 (11th would be taken; the Corps relied on this conclusion in its own analysis. AR 48017-18 (summarizing FWS’ conclusion). Reviewing the full context of the Biological Opinion and the Environmental Assessment, it is clear that neither the FWS nor the Corps shirked its responsibility to consider the cumulative impacts of the RRE and other development on wildlife habitats. Cir. 2010), quoting Greater Yellowstone Coalition v. Flowers, 359 F. 3d 1257, 1269 (10th Cir. 2004) (emphasis in original). Here, the project’s basic purpose—building a road— is not water-dependent. AR 47816. Accordingly, Pasco was required to prove that any alternatives with less adverse environmental impact than the RRE were not practicable. An alternative is practicable “if it is available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes.” Id. § 230.10(a)(2). To determine whether an alternative is practicable, “the Corps must first determine the overall project purpose,” which entails consideration of “the applicant’s purpose” and “the objectives of the applicant’s project.” Friends of Santa Clara River v. United States Army Corps of Engineers, 887 F. 3d 906, 912 (9th Cir. 2018) (quotations and citations omitted). Because the CWA does not require the Corps to use any particular metric for assessing alternatives in light of their “cost, existing technology, and logistics,” the Court will defer to the Corps’ evaluation of those factors as long as it is reasonable. Friends of Santa Clara River, 887 F. 3d at 922; see also National Wildlife Federation v. Whistler, 27 F. 3d 1341, 1344 (8th Cir. 1994) (record indicated Corps considered alternative but dismissed it as inadequate because it was not functional for the applicant’s needs). For example, in City of Shoreacres v. Waterworth, 420 F. 3d 440, 449 (5th Cir. 2005), the Fifth Circuit upheld the Corps’ determination that appellants’ preferred alternatives were not practicable, because they would not comport with the overall project purpose of expanding the county’s port capabilities. Similarly, the Ninth Circuit found that the Corps did not err in rejecting alternatives sites upon its determination that they would not satisfy the project’s purpose of “obtain[ing] specific minerals…to support…industry needs in national and world markets” in Jones v. National Marine Fisheries Service, 741 F. 3d 989, 1002 (9th Cir. 2013); see also Altamaha Riverkeeper v. United States Army Corps of Engineers, 355 F. Supp. 3d 1181, 1188-89 (S.D. Ga. 2018) (Corps’ alternatives analysis was not arbitrary or capricious where it found appellant’s preferred alternative was not practicable in light of project’s purpose of protecting a certain area from erosion, because it covered a different area and would result in only temporary protection); Stewart v. Potts, 996 F.Supp. 668, 675-76 (S.D. Tex. 1998) (where project’s purpose was to build an affordable public golf course for city residents, Corps was within its discretion to conclude alternatives located outside of the city were not practicable).
Here, the Court agrees with the magistrate court that the Corps’ evaluation of the alternative sites’ practicability in light of the overall project purpose was reasonable. The Corps defined the overall project purpose as follows: [T]o improve east-west roadway capacity and enhance overall mobility within the area bound by SR-52 to the north, SR-54 to the south, U.S. Highway 41 to the east, and Moon Lake Road, DeCubellis Road, Starkey Boulevard to the west, and to provide additional roadway capacity and improved routing away from coastal hazard areas and improve evacuation times in the event of a hurricane, or other major weather-related occurrence, in accordance with State of Florida requirements and the County’s current Comprehensive Plan.
AR 47816. As Plaintiffs noted in their response in opposition to Defendants’ crossmotions for summary judgment, the Corps declined Pasco’s request to narrow the project purpose to the creation of a “centrally-located arterial roadway,” AR 13945 (emphasis added), which would have eliminated several of the proposed alternatives to the north and south of the identified region, including Tower Road. Doc. 85 at 26-
27;9 see Friends of Santa Clara River, 887 F. 3d at 912 (“The permit applicant may not define the project purpose narrowly in order to preclude the existence of any alternative sites and thus make what is practicable appear impracticable.”) (quotations omitted). Plaintiffs do not challenge the Corps’ definition of the overall project purpose on appeal.
Armed with this definition, the Corps conducted an extensive evaluation of 19 alternatives, including the “no-action alternative,”10 the RRE, and Tower Road. AR 47928-66. Of those 19, the Corps identified only four that were both reasonable and practicable. Id. at 47965. Its detailed memorandum reveals that two considerations dominated its determination of practicability: whether the alternative would significantly reduce evacuation time, and whether it would require the acquisition of
Clara River, 887 F. 3d at 922; see also C.A.R.E. Now, Inc. v. F.A.A., 844 F. 2d 1569, 1574 (11th Cir. 1988) (“Our task is not to choose the best alternative, but to ascertain that the FAA made a “reasoned choice” among these alternatives.”). The Corps therefore did not abuse its discretion in eliminating Tower Road as impracticable. In arguing otherwise, Plaintiffs ignore these two factors—and the entire practicability question—and instead assert that Tower Road was the LEDPA because it was significantly less expensive and would have substantially less impact on the environment than the RRE. Doc. 101 at 22-23. Plaintiffs dispute the Corps’ calculation that Tower Road would cost seven million dollars more than the RRE, another reason for its impracticability on which the magistrate court relied. Id. at 20- 23. The Corps and Pasco, in turn, challenge Plaintiffs’ calculation of costs and environmental damage. Doc. 102 at 20-21; Doc. 103 at 23-24. But the Court need not resolve this dispute, because the Corps’ finding that Tower Road was impracticable did not depend on its cost. The Court therefore concludes that the Corps’ selection of the RRE as the LEDPA instead of Tower Road was neither arbitrary nor capricious. Plaintiffs’ third objection is due to be overruled.
IV. CONCLUSION
Upon a de novo review, the Court concurs with the magistrate court’s findings and conclusions of law in the Report and Recommendation. The Court further concludes that Plaintiffs’ Objections are due to be overruled. Defendants are entitled to summary judgment in their favor. Accordingly, it is ORDERED: 1. Plaintiffs Sierra Club and Daniel Rametta’s Objections to the Report and Recommendation (Doc. 101) are OVERRULED. 2. The Report and Recommendation entered by United States Magistrate Judge Julie S. Sneed on September1, 2022 (Doc. 100) is adopted, confirmed, and approved and is made a part of this Order for all purposes, including appellate review. 3. Plaintiffs’ Motion for Summary Judgment (Doc. 68) is DENIED. 4. Federal Defendants’, United States Army Corps of Engineers, Scott A. Spellmon, in his official capacity as Chief Engineer and Commanding General of the Corps, and Colonel Andrew Kelley, in his official capacity as Commander and District Engineer of the Corps, Cross-Motion for Summary Judgment (Doc. 82) is GRANTED. 5. Defendant-Intervenor Pasco County Board of County Commissioners’ Cross-Motion for Summary Judgment (Doc. 83) is GRANTED. 6. The Clerk is directed to enter judgment in favor of Defendants, terminate any pending motions, and close this case. DONE and ORDERED in Tampa, Florida on January 20, 2023.
Chae sas Cuda as Wana A gl ell Q_ Charlene Edwards Honeywell United States District Judge Copies furnished to: Counsel of Record Unrepresented Parties
Cases With Similar Vibessemantic neighbors from the corpus
Citator
Authorities Cited (13 total)
- Marina Cooper-Houston v. S. Ry. Co., 37 F.3d 603 (11th Cir. 1994)
- Kleppe v. Sierra Club, 427 U.S. 390 (U.S. 1976)
- Robertson v. Methow Valley Citizens Council, 490 U.S. 332 (U.S. 1989)
- Ashworth v. Glades Cnty. Bd. of Cnty. Comm'rs, 379 F. Supp. 3d 1244 (M.D. Fla. 2019)
- Sierra Club v. Lt. Gen. Robert L. VAN Antwerp Chief of Eng'rs, 526 F.3d 1353 (11th Cir. 2008)
- Dep't of Transp. v. Public Citizen, 541 U.S. 752 (U.S. 2004)
- Sierra Club v. Marsh, 769 F.2d 868 (1st Cir. 1985)
- C.A.R.E. NOW, Inc. v. Fed. Aviation Admin., 844 F.2d 1569 (11th Cir. 1988)
- Pyramid Lake Paiute Tribe OF Indians v. United States Dep't OF The Navy, 898 F.2d 1410 (9th Cir. 1990)
- Headwaters, Inc. v. Bureau OF Land Mgmt., 914 F.2d 1174 (9th Cir. 1990)