KMS OF FLORIDA CORPORATION, APPELLANT,
v.
BRITTANY-MELBOURNE I, LIMITED, APPELLEE

Fla. 5th DCA | 1985-03-07
No. 84-339
COBB, C.J., and FRANK D. UP-CHURCH, Jr. and COWART, JJ., concur.
466 So. 2d 1 Florida District Court of Appeal, Fifth District (1985)

AI-generated. These summaries, headnotes, and key points are machine-generated and may contain errors or omissions. Always verify against the full opinion text below. Not legal advice.

Synopsis

KMS of Florida Corporation appealed a trial court decision regarding an electrical contract dispute with Brittany-Melbourne I, Limited. The appellate court reversed, holding that the contract unambiguously required transformers in vaults rather than on pads, and that service of the contractor's lien claim on the limited partnership's agent and general partner was sufficient under Florida law.


Holding

The court held that the contract clearly and unambiguously required transformers in vaults rather than on pads, and that service of the lien claim on both the limited partner-agent and the general partner was sufficient to establish proper service and delivery as required by statute.


Headnotes

[1] A contract is not ambiguous when its terms and incorporated plans clearly and without ambiguity refer to a specific installation method for electrical transformers.

[2] Admission of parol evidence to interpret a contract is error when the contract terms are clear and unambiguous.

Previewing 2 of 4 headnotes on this case. FLexlaw’s editorially structured points of law — every proposition, pinpointed — are reserved for members.

Join FLexlaw to unlock all legal intelligence

Key Quotes

“The contract between the parties and the electrical contractor's design plans (which were based on the owner's architectural plans which were referred to in the contract) on which the electrical permit was issued, both clearly and without ambiguity, refer to, and contemplate that, the electrical transformers were to be in vaults rather than on pads.”

Establishes that the contract unambiguously required vault-mounted transformers, rejecting the trial court's ambiguity finding.

Previewing 1 of 2 key quotes on this case — the court’s exact language, pinpointed for members.

Join FLexlaw to unlock all legal intelligence

Facts & Procedural History

KMS of Florida Corporation, an electrical contractor, entered into a contract with Brittany-Melbourne I, Limited, a limited partnership, regarding ele…

The full statement of facts, procedural history, and disposition for this case are member content.

Join FLexlaw to unlock all legal intelligence

© FLexlaw, Inc. — AI-generated enrichments are proprietary. All rights reserved.


Opinion of the Court
PER CURIAM.

PER CURIAM.

We make a summary disposition of this appeal.

The contract between the parties and the electrical contractor’s design plans (which were based on the owner’s architectural plans which were referred to in the contract) on which the electrical permit was issued, both clearly and without ambiguity, refer to, and contemplate that, the electrical transformers were to be in vaults rather than on pads. The trial court’s finding that the contract was ambiguous on this point, and the admission of parol evidence on this issue, was error, as also was the finding that the contract required electrical service from pad mounted transformers rather than transformers in vaults.

It was established without question that the appellee, Brittany-Melbourne I, Limited, the entity that contracted with the electrical contractor, was a limited partnership and the owner of the real property in question. It was also established beyond question that the electrical contractor’s affidavit and claim of lien was mailed to, and received by, W. Bryan Johnson, who was a limited partner in Brittany-Melbourne I, Limited, and the agent of Brittany-Melbourne I, Limited, who, on behalf of that limited partnership, entered into the contract with the electrical contractor. Another copy of the same contractor’s affidavit and claim of lien was also mailed to, and received by, Magna Properties, Inc., an admitted general partner in the limited partnership of Brittany-Melbourne I, Limited. We hold, as a matter of law, that this was sufficient to establish service and delivery of the claim of lien as required by section 713.18(l)(c), Florida Statutes.

REVERSED AND REMANDED for further proceedings in accordance with this opinion.

COBB, C.J., and FRANK D. UP-CHURCH, Jr. and COWART, JJ., concur.